THE BASIC THEORY IN CABLING IS “IF YOU SKIMP, YOU'RE HOSED”

So, do it right from the beginning. That cost is minimal compared to the possible and ongoing cost to repay for labor, reinforce cable runs, pay at non-discounted - no quantity rates per run, lay new conduit and disrupt employee production.

Avoid the information bottleneck by implementing a cable infrastructure which will outlast your current needs by fifteen years or more. Determining the appropriate cabling architecture is fundamental to the quality, effectiveness and speed of your communications. From strategic placement of the main computer room and IDF’s (Intermediate Distribution Frame) to mapping the distribution methods for hubs, routers, servers, modems, bridges, gateways, switches and data types - planning is critical.

DON'T DO IT ALONE. It is complex, challenging and best left to the experts at Technology Management. With over 10 years of experience, we can anticipate and prepare a solid plan. Our 4 Phase process is outlined below.

PHASE 1: VALIDATION ANALYSIS


•   Visually inspect and identify type and design layout
•   Document and catalogue voice and data plant elements
•   Identify and examine protection equipment to meet lightning activity and power plant reliability
•   Pursue discussions and investigations into the trouble history
•   Establish networking requirements, expectations, budgets and long term objectives
•   Determine optimum mix of multi and single mode fiber and copper categories


PHASE 2: SPECIFICATION, DESIGN & REQUEST FOR PROPOSAL


•   Compile voice and data transmission requirements
•   Develop requirements for data systems backbone
•   Finalize layouts for cable plant design
•   Determine distances and terminations
•   Identify electrical, compliance and conductivity
•   Customize RFP
•   Determine appropriate vendors
•   Facilitate vendor understanding of needs


PHASE 3: ANALYSIS & REWARD


•   Analyze RFP responses
•   Negotiate contracts, prices, terms, warranties and service support
•   Review performance guarantees


PHASE 4: IMPLEMENTATION


•   Facilitate vendor/client meetings to implement plan, responsibilities and timelines
•   Manage project to oversee and verify compliance
•   Make vendors accountable on all deliverables
•   Monitor conversion, troubleshooting and design changes/change orders
•   Ensure vendor delivers complete and correct documentation
•   Oversee performance testing


Contact us at Technology Management to be sure you have the cabling backbone to support your technology needs.