Every large stadium project has to reconcile the interests of an owner, an architect, and a general contractor. U.S. Bank Stadium added several more layers to that list: politicians, NFL executives, the architectural team, the MEP team, owner representatives, broadcasters, major network television stations, the CIA, FBI, Department of Homeland Security, MSP Airport IT and police, and City staff all had requirements that touched the stadium's technology systems in some way.
For HKS, the challenge was making sure the technology scope of the project – work that would cover data networking, Wi-Fi, video distribution, telephony, and distributed antenna coverage – was designed with the same rigor as the building's architectural and MEP systems. That scope needed to be coordinated across every one of those stakeholders without slowing down the design and construction schedule.
TMC's consultants worked as an extension of the design team throughout the project, coordinating directly with HKS's architects and the MEP engineers so the stadium's technology systems were represented in the drawing set from the start rather than added in after major architectural decisions were made. That coordination covered the full scope of the stadium's technology and AV systems, including:
Beyond the technical design work, TMC also led a full risk assessment covering FEMA designations, crowd control, and the operational overlap between the FBI, City Police, private security, and the press, along with recommendations for redundancy levels and equipment placement to support the stadium's survivability requirements. That assessment gave the ownership group and design team a vendor-neutral basis for comparing platforms and making final decisions.
With TMC embedded in the design process from the start, HKS didn't have to manage the stadium's technology scope as a separate, disconnected workstream.
TMC's architectural technology consultants helped develop T-layer drawings for the data center layouts, network infrastructure, Wi-Fi, DAS, IPTV, and telephony alongside the architectural and MEP drawings, which meant HKS could work from a single, coordinated design package rather than reconciling conflicting requirements late in the process. The TMC team also coordinated directly with NFL executives, broadcasters, the FBI, the Department of Homeland Security, MSP Airport IT and Police, and City staff, which let HKS stay focused on the stadium's architectural and structural design.
U.S. Bank Stadium has since hosted Super Bowl LII and the 2019 NCAA Men's Final Four, and continues to serve as the Minnesota Vikings' home venue, all supported by the technology systems TMC helped design and coordinate alongside HKS.